Reservoir Level Crossing Removal
![](https://www.constructionadvisor.com.au/wp-content/uploads/2019/06/1553120577_rcw-news-reservoislevlecorssing-med-1.jpg)
The Reservoir level crossing will be removed by building a rail bridge over High Street and constructing a new Station.
Direct connection will be created between Edwardes Street and Broadway
A new public plaza will be built with improved shared user paths for pedestrians and cyclists.
The station will include above ground platforms with lift and stairway access