Picton High School
![](https://www.constructionadvisor.com.au/wp-content/uploads/2019/06/1535335863_Picton_High_School.jpg)
Demolition and associated excavation of eight buildings at Picton High School. Construction of a two to three storey building in their place connecting with the remaining six buildings on the site which will be repurposed and/or refurbished.
The increased space will allow for more permanent teaching areas to bring the student numbers up to 1500.
There will be some reconfiguration of the car and bus pick up/drop off areas.