Penshurst Public School NSW
Demolition of all structures in Lots 8-11 DP 8173 including heritage-listed school building of local significance (demolition of non-heritage structures on Lots 3-7 and Lots 12-15 DP 8173 under a separate planning pathway).
Remove trees.
Excavation works for new buildings and construction of new 3 storey building comprising:
Ground floor consisting of 3 separate buildings linked by an under croft created by the levels above with associated external play area comprising:
– ground level administration/learning/library;
– new main school entry to Arcadia St;
– offices;
– administration areas;
– staff facilities;
– one home base room containing 3 HB groups;
– one hearing support unit (HSU) room with dedicated outdoor play space;
– 2 special program rooms;
– library;
– student facilities;
– store rooms;
– waste rooms;
– mechanical rooms;
– breeze-way;
– internal vertical circulation including stairs and lift;
– one HB room containing 3 HB groups;
– ground level learning;
– store rooms;
– mechanical rooms;
– internal vertical circulation including stairs;
– ground level communal hall/canteen/out of school hours (OOSH);
– internal multipurpose sports court with operable walls leading to external spill-out area;
– external sports court;
– raised stage;
– canteen;
– canteen office;
– student amenities;
– OOSH store;
– OOSH kitchen;
– OOSH office;
– storage rooms (chairs sports equipment performance staff bike and general storage);
– internal stair circulation.
First floor internal and external spaces including:
– first floor learning;
– one HSU room;
– student facilities;
– 5 HB rooms each containing 3 HB groups;
– 2 special program rooms;
– mechanical plant & communication rooms;
– internal vertical circulation including 3 sets of stairs;
– lift and covered balcony;
– first floor outdoor;
– outdoor learning spaces and vegetable garden.
Second floor including:
– 2 HB rooms each containing 4 HB groups;
– 5 HB rooms each containing 3 HB groups;
– 1 HSU room;
– student facilities;
– internal vertical circulation including 3 sets of stairs;
– mechanical plant and communication rooms;
– lift;
– covered balcony.
Third floor roof top playground including:
– COLA and uncovered play areas;
– shade structures;
– outdoor/learning;
– student amenities;
– palisade fencing;
– internal vertical circulation including 3 sets of stairs lift and covered balcony.
New palisade fencing 2.1m height along part of Arcadia Street adjacent to new buildings and 1.5m high palisade fencing to property interior. Roof top photo-voltaic panels above COLA. A grade staff car park of 15 parking spaces and student bicycle parking along Arcadia Street and some associated landscaping.