Alfred Hospital Sewer and Water Inundation
The Alfred Hospital required an upgrade to sewerage and storm water system including alterations to the Mail Ward Block sewer and greasy waste systems and the roof and roof drainage system of the Main Ward Block and South Block. The Philip and East Block require upgrades to the roof drainage system only. There will be some replacement of pipework within the existing buildings as well.